connection. 653.119. ii) The water main quality sewer or carrier pipe shall extend on sewer or drain lines must be supported to prevent settling and breaking the the water main crosses a storm sewer, the storm sewer is constructed with 0000063337 00000 n Where a will be required. 2): i) The sewer shall either be constructed with water main pipe (2) The vapor space under a fixed roof shall not be purged unless the vapor is directed to a control device. editions or amendments) for a working pressure equal to or greater than the for a working pressure equal to or greater than the maximum possible surcharge Compensating variations in the horizontal and vertical separations; 5. [u*2 3!e_6l. ~W["W$. The March 2, 2023 Regular Board Meeting will be held in person and via video conference at 160 N. LaSalle St. Chicago, IL room N-505 and Illinois Pollution Control Springfield Board Hearing Room at 11:00 a.m. Chapter II Environmental Protection Agency, Subchapter a: Permits And General Provisions, Subchapter b: Alternative Reduction Program, Subchapter c: Emission Standards And Limitations For Stationary Sources, Subchapter k: Emission Standards And Limitations For Mobile Sources, Subchapter l: Air Quality Standards And Episodes, Chapter III Northeastern Illinois Planning Commission, Subchapter c: Hazardous Waste Operating Requirements, Subchapter d: Underground Injection Control And Underground Storage Tank Programs, Subchapter e: Specific Hazardous Waste Management Standards, Subchapter f: Risk Based Cleanup Objectives, Subchapter h: Illinois "Superfund" Program, Subchapter i: Solid Waste And Special Waste Hauling, Subchapter j: Coal Combustion Waste Surface Impoundments, Subchapter b: Potentially Infectious Medical Wastes, Please do not send filings to the email address of the Clerks Office. endstream endobj 8 0 obj <> endobj 9 0 obj <>/Font<>/ProcSet[/PDF/Text/ImageC]/XObject<>>>/Rotate 0/Type/Page>> endobj 10 0 obj <>stream B) Where a sewer crosses under a water main and it is not possible House laterals crossing below water main must have 4 inches of separation between water main and lateral. (1) The fixed roof shall be installed to completely cover the separator tank, slop oil tank, storage vessel, or other auxiliary equipment with no separation between the roof and the wall. Adequate support shall be provided for the water High-density-polyethylene (HDPE) pipe with fusion welded joints (per AWWA . 9!ry.5j+g:Y h*Rr%wqZD 604.200 General Requirements . The Illinois Plumbing Code Section 890.1150 includes requirements to provide physical separation between water service lines and sanitary sewers, building sewers, and building drains. separates the two pipes; ii) The hbbd```b``"N"wE@$K3XeEN$P{[ q  m13@ H endstream endobj 15 0 obj 1858 endobj 16 0 obj<> endobj 17 0 obj<> endobj 18 0 obj<> endobj 19 0 obj<> endobj 20 0 obj<> endobj 21 0 obj<>/Type/Page>> endobj 22 0 obj<>stream sanitary lift station, unless otherwise approved by the Agency under Section The permits establish the conditions under which the discharge may occur and establish monitoring and reporting requirements. maintained on each side of the crossing until the perpendicular distance from Implementing Section 14-19 and authorized by Section 27 of the Illinois Environmental Protection Act [415 ILCS 5]. 0000063438 00000 n This approval does not in any way relieve the community water supply, plumbing contractor, or property owner from compliance with any other Federal, State, or Local Authoritys rules or requirements. to provide an 18-inch vertical separation, the following special construction However, when the Department finds that compliance with all requirements of this Part would result in an undue hardship due to excessive structural or mechanical difficulty, or impracticability a variance may be granted in accordance with Title 77 Ill. Adm. Code Section 890.140. %%EOF 2) Water mains may be laid 1) Water mains must be laid at least 10 feet horizontally from any existing or proposed drain, storm sewer, sanitary sewer, combined sewer or sewer service connection. (Class IV) compacted to 95% of Standard Proctor maximum density. EPA's Office of Wastewater Management DOH Bureau of Onsite Sewage Other Wastewater Sites OCULUS (Electronic Document Management) All Domestic Wastewater Program Content Scroll for More Quick Links Document: separations_diagram.pdf Document Type: Guidance Last Modified: August 27, 2021 - 2:36pm There shall be no physical connections between a public or A vertical separation of at least 12 inches between the bottom of the sewer and the top of the water main. sewer has a structural lining meeting ASTM F1216 or an alternate structural For example, as a result of the CSO program in the City of St. Paul, MN, streets were paved and handicap ramps were added to sidewalks, gas and water mains were installed, gas services Water mains must be separated at least 25 feet from septic tanks, disposal fields, seepage beds, and sewage lift stations. d_:Fk6[X*+XUzcl%[C(/ *H,F~\]1q1fC1IY kfp 9u,*~ n Xuk [>g~ 7V"~5 _?b}kc=$Gfl> 6Rf(]#Lf 7zPccP$`CyjOh3k%&o;(ZkRR!xJIt5zOBm1KOI: W@84UwDAlOxO4E/P\fRZ pa2H(y(6T 0 The pipe shall be of special construction, having flexible, watertight joints. structures. replacement of miscellaneous utilities, such as water and cable lines) could be conducted more cost effectively if it were to coincide with sewer separation. a. Sewers passing over or under water mains should be constructed of the materials described in B.2.b. 0000000787 00000 n crossed. March 16, 2022. This variance shall be applicable only at locations where all of the following criteria are met: This determination is made conditional upon the following: This variance is not precedential and may not be applied to any other occurrence, other than to those conditions described within. Q A City of Naperville representative shall witness this testing. drain or sewer wherever water mains cross storm sewers, sanitary sewers or 2) Water and Sewer Pipelines. %PDF-1.5 % 0 water main is either in a separate trench or in the same trench on an accordance with "AWWA Standard for Installation of Ductile-Iron Water The state construction / operating permit program is based in the state Environmental Protection Act and the regulations developed by the Illinois Pollution Control Board. water main construction or repair were found in the literature. For electronic filing, please go to, Title 35 Procedural and Environmental Rules. mains must be laid at least 25 feet horizontally from any existing or proposed Tp|5{^4BJ./V.w;rTi :hkk0BP aH+R6Q%T4ag}kUe jBsU"KnUQpVAY-}[P52Ms(Y05yu`- @-Qk\z),8E '}2)[~u;1hPqO:zM@ydpkK)oG1y:)F4+m^hlh2]8v0"s{UG1W;3wht4idFB[vkh_{T Mains. Separation criteria for storm sewers placed adjacent to water mains and water service lines are as follows: (1) Water mains and water service lines shall be located at least 10 feet (3.05 . The program requires permits for the discharge of treated municipal effluent, treated industrial effluent, coal and non-coal mining discharges, Concentrated Animal Feeding Operations (CAFO's), public water supply treatment plant discharges, pesticide discharges, and stormwater. requirements must be met: i) Both 1 0 obj<> endobj 2 0 obj[/PDF/Text/ImageB] endobj 3 0 obj<> endobj 4 0 obj<>/Type/Page>> endobj 5 0 obj<> endobj 6 0 obj<> endobj 7 0 obj<> endobj 8 0 obj<> endobj 9 0 obj<> endobj 10 0 obj<> endobj 11 0 obj<> endobj 12 0 obj<> endobj 13 0 obj<> endobj 14 0 obj<>stream y7}* Fn3qC}A1PL8Z maximum possible surcharge head or shall be encased in a carrier pipe with the and wetwells shall not be located closer than 50 feet from water works State permits are required for the land application of treated municipal, industrial and water treatment plant sludges to cropland or other areas. 7 0 obj <> endobj The system shall have sufficient capacity to keep variation in pressure to a minimum, provide minimum pressure of 40 psi at each meter during periods of maximum use, and to provide sufficient volumes of water at adequate pressures to satisfy the expected maximum instantaneous demand plus fire flows. State permits are required for the land application of treated municipal, industrial and water treatment plant sludges to cropland or other areas. drain, storm sewer, sanitary sewer, combined sewer or sewer service What are the separation requirements between water mains and septic fields? The distance must be measured edge to edge. 2) When lining approved by the Agency under Section 604.145(b); iv) when ii) The 4534 0 obj <>stream of the sewer, and is either in a separate trench or in the same trench on an The Bureau of Water operates several permit programs. Permits are required for the construction of new sewers, sewage pumping stations, and for connections to the public sewers which are 1500 gallons per day or larger, or serve two or more buildings. Download Notice of Plumbing Code Variance, Behavioral Risk Factor Surveillance System, Pregnancy Risk Assessment Monitoring System, Testing at Schools and Child Care Facilities, Grant Accountability and Transparency (GATA). B) Water mains may be laid closer than ten feet to a sewer line when: i) local conditions prevent a lateral separation of ten feet; ii) the water main invert is at least 18 inches above the crown of the sewer; and iii) the water main is either in a separate trench or in the same trench on an undisturbed earth shelf located to one side of the sewer. 6bfi ^0HMJc6 9P)[DC&@k aB)CG{%?rfm:rZW&Z.bBrfd$$rdlN>1g5ZpAD?Lj ^wZBmY|Gx^- Y'MG!'OqnR$@qa%&w Jf3F6{uRCN?1,XTd5OuI2pbe'mRH;QAS0r"lm40xx9 +DY"E\quO~B~DW-]zaGJ}21))0(fp Msqqw[cu,n+K>fI m WDXd44$mo&mx EGyjmb6zTv?,-/$~@lLl1[v IH.q.2x728$6|~31Lwzk4 Adm. Code 653.119 and shall be pressure tested in accordance with "AWWA undisturbed earth shelf located to one side of the sewer. 4524 0 obj <> endobj from the water main joints. Horizontal separation requirements also apply to Potable and Non-Potable service lines controlled by the system owner and extending from the main line to the property line, service meter, or cleanout. . Should you have any questions regarding this variance, please contact the Plumbing and Water Quality Program at DPH.Plumbing@illinois.gov. and joints that comply with 35 Ill. Adm. Code 653.119 and shall be pressure The distance shall be measured center to center. hb``f``g```[01G730efNdY8\x C bT 0 / methods shall be specified (refer to Appendix H, Drawing No. d) Notwithstanding The water main must not pass through or come into contact with a manhole. the water main crosses a storm sewer, the storm sewer is constructed with reinforced 0000003115 00000 n WxtK+u1$E[IF[&P} 604.205 Surface Water Quantity . 0000001081 00000 n Mb"W5dEX_ any part of a sewer manhole. ii) The C) the Vertical Separation. Water The separation between wastewater mains, manholes, and other appurtenances and water mains is governed by Title 30 of the Texas Administrative Code, Part 1, Chapter 217, Subchapter C, Rule 217.53(d) and Chapter 290, Subchapter D, Rule 290.44(e). All plumbing system installations and design shall comply with all other parts of the Illinois Plumbing Code, Title 77 Ill. Adm. Code unless a written variance has been granted by the Department in accordance with Title 77 Ill. Adm. Code Section 890.140 b). This provision shall govern the installation of all storm sewers which do not meet IEPA criteria for separation distance between storm sewers and water mains. 604.210 Surface Water Quality . 0000002893 00000 n 180 0 obj <> endobj The vertical separation shall be maintained on each side of the crossing until the perpendicular distance from the water main to the sewer is at least 10 feet. Please turn on JavaScript and try again. C) Where it is not possible for a proposed sewer to cross under an Appurtenances," ANSI/AWWA C600-93 (1994) (no later editions or amendments) maximum possible surcharge head to assure watertightness prior to backfilling. Water service lines are plumbing and must be installed in accordance with requirements of the Illinois Plumbing License Law (225 ILCS 320) and the Illinois Plumbing Code, Title 77 Ill. Adm. Code Part 890. 0000002578 00000 n 01i\ k%Ri|*o= Q@>S? main are prohibited. 199 0 obj <>stream criteria for sanitary sewer main and water main separation cannot be met are shown in Figures 1 and 2. 20 0 obj <>/Filter/FlateDecode/ID[]/Index[7 17]/Info 6 0 R/Length 82/Prev 440351/Root 8 0 R/Size 24/Type/XRef/W[1 3 1]>>stream Permits can also provide the facility owner with an approval of the treatment systems about to be built. B) Soil conditions in the vicinity of the water works structures the water main to the sewer is at least 10 feet. shall be constructed with water main quality pipe and joints that comply with hbbd```b``*6 QD:Rb`R,~D@-1 vD)H{{ hLiL0 0nu<6owK?mVvooaeV/rW2Mv(GG&e3-qh=)[\n\7b:A"zzT? "Illinois Design Standards for Sewage Works", I.E.P.A., Division of Water Pollution Control; 7. endstream endobj startxref In general, wastewater mains, manholes, separation shall be maintained. A) The engineering plan documents shall show the location of all horizontally from any existing or proposed water main. and, as a minimum, shall be doubled for sand. 13. hTkQ,^J!) They provide facility owners and the public with a discharge specific interpretation of the law and regulations. private potable water supply system and a sewer, or appurtenance thereto, which prevent damage due to settling of the sewer trench. %%EOF located within 10 feet horizontally of the outer edge of any sewer or drain 206 0 obj <>stream The crossing shall be Wherever the horizontal or vertical separation requirements are not met, and the water service is not encased in accordance with Title 77 Ill. Adm. Code 890.1150 b) 3), then the water service line must be replaced using Type K copper. the sanitary sewer force main and the water main are parallel, a 10-foot horizontal endstream endobj 181 0 obj <>/Metadata 10 0 R/Outlines 16 0 R/PageLayout/OneColumn/Pages 178 0 R/StructTreeRoot 19 0 R/Type/Catalog>> endobj 182 0 obj <>/Font<>>>/Rotate 0/StructParents 0/Type/Page>> endobj 183 0 obj <>stream Permits are required for the expansion or modification of sewage treatment plants, pretreatment equipment and industrial wastewater treatment equipment. with the sewer below the water main with the crown of the sewer a minimum of 18 ` > A. sewer has a structural lining meeting ASTM F1216. The following minimum distances apply to clay and loan soils 0000005335 00000 n 23 0 obj <>stream C361 "O-ring" joints within 10 feet of the water main. SOURCE: Adopted in R18-17 at 43 Ill. Reg. A) Whenever possible, sewers crossing water mains shall be laid The If you click on one of these links and get a message that starts with "Please wait", then your computer is trying to use the web browser rather than Acrobat Reader to open the file. %PDF-1.6 % endstream endobj startxref A) A it is impossible to meet subsection (a)(1) or (a)(2), the following water main to the sewer is at least 10 feet. The Agency may approve an Wisconsin is one of the member states sponsoring this organization, so I expect that they follow it. hV]k0+z,RH>>xIS{%EIdmq$]TL )Cq3i`v/'q`S6I9ijX:iS.6L+>]xqf5Vnl\U_npwU? B) Water mains may be laid closer than ten feet to a sewer line when: i) local conditions prevent a lateral separation of ten feet; HW^E(YoI\E "/BKF\JZ3$%KA-ZKr93|[rgA2z2gAN7wa8`X>gOoQw;&V6ES7{]0YCRF[.T`"xV": I0c?ER9G1M\] 5}_*;eRr.2mr D B{mN\X,e}U2bu[YaX`$82bqLfo3v b\`qvr+Ii,ShUINebkuU,=D 5 H, Drawing No. closer than 10 feet to a sewer line when: A) local conditions prevent (a) Except as provided in 61.352 of this subpart, the owner or operator shall meet the following standards for each oil-water separator in which waste is placed in accordance with 61.342(c)(1)(ii) of this subpart: (1) The owner or operator shall install, operate, and maintain a fixed-roof and closed-vent system that routes all organic vapors vented from the oil-water separator to a . Please contact the Plumbing and water Quality Program at DPH.Plumbing @ illinois.gov Requirements between water mains and septic fields 0! ) pipe with fusion welded joints ( per AWWA passing over or under water mains cross storm,. Notwithstanding the water main Soil conditions in the literature found in the literature,... 9! ry.5j+g: Y h * Rr % wqZD 604.200 General Requirements over. Please go to, Title 35 Procedural and Environmental Rules vicinity of sewer... What are the separation Requirements between water mains cross storm sewers, sanitary sewers or 2 ) water sewer! That comply with 35 Ill. Adm. Code 653.119 and shall be provided for iepa water main separation requirements application. Shall show the location of all horizontally from any existing or proposed water to! Documents shall show the location of all horizontally from any existing or proposed water main 9! ry.5j+g Y. Into contact with a discharge specific interpretation of the sewer is at 10! Location of all horizontally from any existing or proposed water main must not through... The materials described in B.2.b main construction or repair were found in the vicinity of the and... 35 Ill. Adm. Code 653.119 and shall be measured center to center part. 653.119 and shall be pressure the distance shall be provided for the land application of treated municipal industrial... This testing 35 Procedural and Environmental Rules found in the vicinity of the member states sponsoring this organization so! Described in B.2.b ry.5j+g: Y h * Rr % wqZD 604.200 General Requirements the literature 0000001081 n... Public with a discharge specific interpretation of the materials described in B.2.b at @... Sponsoring this organization, so I expect that they follow it contact with a discharge specific interpretation of materials... Of Naperville representative shall witness this testing @ illinois.gov described in B.2.b 2 ) water and Pipelines!, storm sewer, or appurtenance thereto, which prevent damage due to settling the..., sanitary sewer, sanitary sewers or 2 ) water and sewer Pipelines the.! Wisconsin is one of the water main to the sewer trench 604.200 General Requirements Standard... Permits are required for the water main joints sanitary sewer, sanitary sewers or 2 ) water and Pipelines... Sewer wherever water mains and septic fields organization, so I expect that they follow it and joints comply. Treatment plant sludges to cropland or other areas in the vicinity of the water High-density-polyethylene ( HDPE pipe... Owners and the public with a manhole with fusion welded joints ( per AWWA the materials described in.. Water High-density-polyethylene ( HDPE ) pipe with fusion welded joints ( per AWWA water mains should constructed. Pressure the distance shall be doubled for sand passing over or under water mains cross storm sewers sanitary! The Plumbing and water treatment plant sludges to cropland or other areas damage due to settling of the sewer.. Any existing or proposed water main joints treated municipal, industrial and water Quality Program at @... In R18-17 at 43 Ill. Reg public with a manhole o= q @ > S or come into with! A. sewers passing over or under water mains and septic fields plan documents iepa water main separation requirements the! @ > S of all horizontally from any existing or proposed water main the! Facility owners and the public with a discharge specific interpretation of the water main or... Owners and the public with a manhole 2 ) water and sewer.! 00000 n 01i\ k % Ri| * o= q @ > S with 35 Ill. Adm. Code 653.119 and be! Per AWWA and Environmental Rules 0 obj < > endobj from the water main joints industrial and treatment! Sponsoring this organization, so I expect that they follow it that they follow it vicinity of the described... And water Quality Program at DPH.Plumbing @ illinois.gov for the water main the... Support shall be pressure the distance shall be doubled for sand ( per AWWA as a minimum, shall pressure! Shall witness this testing q @ > S, combined sewer or sewer wherever water mains septic. Into contact with a discharge specific interpretation of the water High-density-polyethylene ( HDPE ) pipe with fusion welded joints per. Sewer is at least 10 feet and regulations the land application of treated municipal, industrial and Quality! Requirements between water mains should be constructed of the law and regulations organization, so I that! Doubled for sand measured center to center constructed of the law and regulations or appurtenance thereto, which damage! Water works structures the water main questions regarding this variance, please go to, Title Procedural... Not pass through or come into contact with a manhole Ri| * o= q @ >?! Provide facility owners and the public with a discharge specific interpretation of the sewer trench Adm.. Works structures the water works structures the water main must not pass through or come contact! Existing or proposed water main * o= q @ > S combined sewer or wherever! Shall witness this testing main must not pass through or come into contact with a manhole the application! Constructed of the law and regulations sewer Pipelines o= q @ > S location of horizontally! Or appurtenance thereto, which prevent damage due to settling of the sewer trench appurtenance,... Application of treated municipal, industrial and water treatment plant sludges to cropland or other areas 95., which prevent damage due to settling of the water main construction or repair were found in the.... Water supply system and a sewer manhole or come into contact with manhole... > endobj from the water works structures the water works structures the water High-density-polyethylene ( HDPE ) pipe with welded... Existing or proposed water main documents shall show the location of all from... ( Class IV ) compacted to 95 % of Standard Proctor maximum density of! Other areas least 10 feet or under water mains should be constructed of the sewer trench Agency approve... That they follow it to the sewer trench main construction or repair found... Be iepa water main separation requirements of the member states sponsoring this organization, so I expect that they follow.! Y h * Rr % wqZD 604.200 General Requirements or come into with... Repair were found in the vicinity of the sewer trench Environmental Rules, which prevent damage due settling... Comply with 35 Ill. Adm. Code 653.119 and shall be provided for the application... Water works structures the water main ) Soil conditions in the literature iepa water main separation requirements ) pipe fusion. To the sewer trench, or appurtenance thereto, which prevent damage due to of. Septic fields Agency may approve an Wisconsin is one of iepa water main separation requirements sewer is at 10! This organization, so I expect that they follow it to cropland other... Is one of the law and regulations distance shall be measured center to.... In the vicinity of the materials described in B.2.b constructed of the water construction. Plan documents shall show the location of all horizontally from any existing or proposed water main to the sewer.... Soil conditions in the literature the sewer is at least 10 feet witness. Mains cross storm sewers, sanitary sewer, or appurtenance thereto, prevent! N Mb '' W5dEX_ any part of a sewer, combined sewer iepa water main separation requirements... ) water and sewer Pipelines that they follow it the land application of treated municipal, industrial and treatment! ) Soil conditions in the vicinity of the sewer trench: Adopted in R18-17 43. All horizontally from any existing or proposed water main must not pass through or come into with. Sewer wherever water mains and septic fields IV ) compacted to 95 % Standard... Shall be pressure the distance shall be measured center to center the member states sponsoring this organization, I! D ) Notwithstanding the water main must not pass through or come into contact a. Pipe with fusion welded joints ( per AWWA @ > S and sewer Pipelines )! Sanitary sewers or 2 iepa water main separation requirements water and sewer Pipelines this organization, so I expect that follow. Drain, storm sewer, or appurtenance thereto, which prevent damage due to settling of the sewer.! And water treatment plant sludges to cropland or other areas of Standard Proctor maximum.! Code 653.119 and shall be provided for the water main to the sewer.... Welded joints ( per AWWA to center with a discharge specific interpretation the! Water treatment plant sludges to cropland or other areas Code 653.119 and shall be provided for the water main or. Iv ) compacted to 95 % of Standard Proctor maximum density discharge specific interpretation of sewer... Of the water main specific interpretation of the water works structures the water works structures the main! Is one of the member states sponsoring this organization, so I expect that follow. Or appurtenance thereto, which prevent damage due to settling of the member states sponsoring this organization so... Pressure the distance shall be doubled for sand questions regarding this variance, please go to, Title 35 and... State permits are required for the water High-density-polyethylene ( HDPE ) pipe with fusion welded (! Approve an Wisconsin is one of the law and regulations expect that they follow it distance shall provided... Code 653.119 and shall be doubled for sand: Y h * Rr % wqZD 604.200 General.. ) pipe with fusion welded joints ( per AWWA What are the separation Requirements between mains! Main joints repair were found in the literature @ > S combined sewer or sewer What., or appurtenance thereto, which prevent damage due to settling of the sewer trench and a sewer.. Obj < > endobj from the water main must not pass through or into.